Guides for site deliveries
What to clarify before a site delivery – so the quote is right and nothing comes as a surprise on delivery day.
Guides
- Standard or abnormal load?When a building element transport becomes an abnormal load: width and height limits under German law, permits – what counts is the loaded vehicle.
- Planning delivery slotsHow sites plan delivery slots: notice, crane plan, booking systems, buffers and what the site should report before delivery.
- Access and unloading areaWhat a building material delivery needs on site: clearance height, turning space, firm ground, outrigger space and a clear unloading area.
- Crane truck or forklift?Decision aid for site unloading: when a crane truck, when a truck-mounted forklift, when the site crane – by goods, ground and distance.
- Crane unloading: who slings?Roles in crane unloading on site: crane operator, slinger, banksman – who is appointed, which lifting points apply, what to clarify beforehand.
- Load securing for glassTransporting glass safely: panes on the rack, rack on the vehicle, German road traffic rules and the VDI 2700 series as the basis, manufacturer specifications.
- Glass racks and A-framesWhich glass racks exist – A-frame, L-rack, inloader rack – what that means for vehicle and unloading, and who gets the racks back.
- No-parking zone and kerb spaceKerbside space for truck and crane at the site: who applies for a no-parking zone and traffic order, what space is needed, what to clarify early.
- Delivery notice and documentsWhat belongs in a delivery notice for the site and which documents accompany the goods: delivery note, packing list, position or laying plan, contact.
- Receipt and damage recordsReceiving building elements properly: visual check when unloading, note damage on the delivery note at once, photos – especially for glass, façades and windows.
- Surface and weather protectionProtecting façade surfaces, timber elements and insulation in transit: packaging, contact points, tarpaulins and short gaps between delivery and installation.
- Truck-mounted forklift: payloadWhy a truck with a mounted forklift carries less: the forklift counts towards vehicle mass, axle loads shift – also after partial unloading. No blanket values.
- Planning recurring deliveriesSupplying sites over months: setting a rhythm, call-off chain and notice, contacts, changes – so regular deliveries stay predictable.
- What drives transport costsCost drivers in building material transport: unloading equipment, waiting time, tight slots, empty runs, rack returns and special sizes – without flat rates.
Frequently asked questions
What matters most for a site delivery?
An accessible unloading point, suitable unloading and a contact on site. Most problems arise in the last few metres.
Do the guides replace legal advice?
No. They give an overview; for binding information contact the responsible authority or accident insurer.
Where can I see which details you need?
In the request form and in the guides on access, time slots and delivery papers.
Ready to plan?
Send us the key data – route, date and what is being transported. Anything you do not know yet can be left open.
Request a materials transport