Baustoff-Logistik
Building materials logistics services
From a single glass rack to supplying a whole construction phase: every service starts with the question of how and when unloading takes place on site.
Services
- Site delivery with time slotConstruction site delivery with a time slot: materials arrive in the agreed window, coordinated with site management, with notice. Request a quote.
- Crane truck deliveryBuilding materials delivered by crane truck: loader crane via partners, outrigger space, obstacles and slinger agreed first. Request a quote.
- Truck-mounted forklift deliveryPalletised building materials unloaded by truck-mounted forklift – no forklift needed on site. Via partners; firm, level ground required. Request a quote.
- Inloader transportInloaders for glass racks and upright wall elements: the rack is picked up and set down, height within standard limits. Can be organised via partners.
- Glass transportGlass transport for flat and insulating glass on A-frames and L-racks: racks secured, edges protected, visual check at handover. Request a quote.
- Façade element transportTransporting façade elements to site: surface protection, racks, loading sequence by installation plan, unloading in the agreed slot. Request a transport.
- Delivery in installation sequenceBuilding elements delivered in the order of installation: loading sequence by floor and grid line, marking, call-off per section – for standard-size loads.
- Recurring site supplySupplying sites over weeks and months on a planned basis: fixed delivery days, call-offs by progress, one contact. Framework by arrangement.
- Return of glass racksEmpty glass racks, façade racks and empty pallets back to the plant: count, condition, return point – combined with outbound deliveries by arrangement.
- Direct plant-to-site runBuilding elements straight from plant to site without transhipment: less handling for sensitive goods, loading slot at the plant, delivery in the agreed slot.
- Inner-city site deliveriesBuilding materials into the city centre: narrow access, kerbside space, delivery slots and crane-truck unloading – clarified with the site in advance.
- Multi-stop deliveriesOne run, several consignees: bundling building materials for several sites, loading sequence by unloading order, notice and delivery note per stop.
- Cross-border site deliveriesBuilding elements and materials to sites across Europe: EU single market, customs for Switzerland, Norway and the UK clarified, on-site contact and papers.
- Return of unused materialsUsable surplus back to merchant, plant or depot: pallets, boards, elements – counted and documented. No waste or disposal service.
Frequently asked questions
Which service fits my delivery?
That depends on goods, site and unloading. Choose what you know in the form – we propose the suitable solution.
Are crane trucks and truck-mounted forklifts your own vehicles?
We organise them via partners, by arrangement. Whether a vehicle fits is checked per request.
Do you also handle installation or fitting?
No. We transport and unload as agreed; installation and fitting are done by your team.
Ready to plan?
Send us the key data – route, date and what is being transported. Anything you do not know yet can be left open.
Request a materials transport