How a site delivery works
Four steps – and before every quote, clarity on how and where unloading will take place on site.
- 01
Request
You tell us collection point, site, date, load and unloading. Missing values can be marked as “not known yet”.
- 02
Review
We check route, vehicle and unloading situation. If something is missing we ask specifically – for example for photos of the access or the weight of the heaviest piece.
- 03
Quote
The quote states the scope: transport, delivery slot, unloading as agreed, waiting-time rule and return runs for racks or empties.
- 04
Delivery
Notice before departure, delivery in the agreed slot, unloading at the agreed point and handover against delivery note.
Standard load or abnormal load
We plan loads within the general vehicle limits. If vehicle and load exceed them – for example with very tall wall elements or long beams – we plan the transport separately as an abnormal load, with a permit where required.
Unloading on site
If the site has no free crane or forklift, crane trucks or truck-mounted forklifts can be organised via partners. What can be lifted depends on weight, distance and standing position – so we ask precisely beforehand.
Countries and borders
Within the EU there are no customs formalities. For Switzerland, Norway and the United Kingdom we clarify before quoting who declares export and import, and plan clearance into the slot.