Guides
Delivery notice and delivery documents
A good notice saves phone calls on site: it says what is coming, when, on which vehicle and who the contact is. The delivery documents then state exactly what was handed over. Together they are the basis for smooth receipt and for any later clarification.
What matters
- Notice
- Goods, slot, vehicle type and contact – before departure.
- Delivery note
- What is handed over, with quantities and positions.
- Packing list
- For racks, packs and elements: what is loaded where.
- Plans
- Laying or installation plan when delivering by position.
Planning questions
We clarify these points before quoting – the earlier they are known, the more precise the plan.
- Who should receive the notice?
- What details does the site need?
- Are there position or laying plans?
- Who signs for the handover?
What we need from you
- Notice recipient
- Details needed
- Plans and lists
- Person signing
Preparation: Installation, fitting and distribution inside the building are done by your team. We deliver to the agreed, accessible unloading point – unloading scope, waiting time and returns are set out in the quote.
What we do for you
What we organise
- Transport of building materials and elements within standard limits – from plant or merchant to site
- Delivery in the agreed slot, with notice and a fixed contact
- Crane truck, truck-mounted forklift or inloader can be organised via partners, by arrangement
Good to know
If the contact is missing on site, receipt becomes difficult. Name a deputy.
How it works
- 01
Request
You send collection point, site, date and load details using the form below – anything unknown can stay open.
- 02
Review
We clarify who receives the notice and which documents the site needs.
- 03
Quote
You receive a quote with a clear scope: transport, delivery slot, unloading and any return runs.
- 04
Execution
Notice before departure, documents on board, handover against signature.
Questions and answers: Delivery notice and documents
What is in a delivery notice?
Goods, planned delivery slot, vehicle type and contact – on request also unloading equipment and plate number once known.
Who signs for the delivery?
A person named by the site. They check quantity and condition and note anything unusual on the delivery note.
Can delivery notes be digital?
As far as agreed and supported by the partner. What matters is that the handover is documented traceably.
Request
Request for this topic: Delivery notice and documents
Three steps. Anything you do not know yet can be left open.
Details for planning
- Notice recipient
- Details needed
- Plans and lists
- Person signing