Planning delivery time slots properly
A delivery slot is an agreement between site and transport. It holds if both sides know what they have to do by then: the site crane, space and receiving; the transport collection, route and notice. These points help to plan slots realistically.
What matters
- Crane plan first
- Put slots where the crane is really free.
- Notice
- The earlier goods, quantity and unloading are fixed, the more stable the slot.
- Buffer
- Do not make slots too tight – traffic and plant loading times vary.
- Report changes
- If the site shifts, tell us at once.
Planning questions
We clarify these points before quoting – the earlier they are known, the more precise the plan.
- When is the crane free for unloading?
- Roughly how long does unloading take?
- Who confirms the slot on site?
- What applies in case of delay or postponement?
What we need from you
- Crane plan
- Unloading time
- Contact
- Rule for postponements
Preparation: Installation, fitting and distribution inside the building are done by your team. We deliver to the agreed, accessible unloading point – unloading scope, waiting time and returns are set out in the quote.
What we do for you
What we organise
- Transport of building materials and elements within standard limits – from plant or merchant to site
- Delivery in the agreed slot, with notice and a fixed contact
- Crane truck, truck-mounted forklift or inloader can be organised via partners, by arrangement
Good to know
A slot is only as good as its weakest point. Allow honestly for plant loading, travel and unloading time – traffic and site conditions can still shift it, in which case we tell you early.
How it works
- 01
Request
You send collection point, site, date and load details using the form below – anything unknown can stay open.
- 02
Review
We check route, plant loading time and unloading time and propose a realistic slot.
- 03
Quote
You receive a quote with a clear scope: transport, delivery slot, unloading and any return runs.
- 04
Execution
Agree the slot, notice before departure, report any deviation.
Questions and answers: Planning delivery slots
How long should a delivery slot be?
Long enough for traffic and plant loading time, short enough to keep the crane schedule workable. For many sites that is a window of a few hours – we agree it per route.
Who pays if the vehicle has to wait?
How waiting time is charged is set out in the quote. A well-coordinated slot usually avoids it.
What should the site report before delivery?
Whether crane, unloading area and contact are ready – and any shift in the schedule as soon as it is foreseeable.
Request
Request for this topic: Planning delivery slots
Three steps. Anything you do not know yet can be left open.
Details for planning
- Crane plan
- Unloading time
- Contact
- Rule for postponements