Planning delivery time slots properly

A delivery slot is an agreement between site and transport. It holds if both sides know what they have to do by then: the site crane, space and receiving; the transport collection, route and notice. These points help to plan slots realistically.

What matters

Crane plan first
Put slots where the crane is really free.
Notice
The earlier goods, quantity and unloading are fixed, the more stable the slot.
Buffer
Do not make slots too tight – traffic and plant loading times vary.
Report changes
If the site shifts, tell us at once.

Planning questions

We clarify these points before quoting – the earlier they are known, the more precise the plan.

  1. When is the crane free for unloading?
  2. Roughly how long does unloading take?
  3. Who confirms the slot on site?
  4. What applies in case of delay or postponement?

What we need from you

  • Crane plan
  • Unloading time
  • Contact
  • Rule for postponements

Preparation: Installation, fitting and distribution inside the building are done by your team. We deliver to the agreed, accessible unloading point – unloading scope, waiting time and returns are set out in the quote.

What we do for you

What we organise

  • Transport of building materials and elements within standard limits – from plant or merchant to site
  • Delivery in the agreed slot, with notice and a fixed contact
  • Crane truck, truck-mounted forklift or inloader can be organised via partners, by arrangement

Good to know

A slot is only as good as its weakest point. Allow honestly for plant loading, travel and unloading time – traffic and site conditions can still shift it, in which case we tell you early.

How it works

  1. 01

    Request

    You send collection point, site, date and load details using the form below – anything unknown can stay open.

  2. 02

    Review

    We check route, plant loading time and unloading time and propose a realistic slot.

  3. 03

    Quote

    You receive a quote with a clear scope: transport, delivery slot, unloading and any return runs.

  4. 04

    Execution

    Agree the slot, notice before departure, report any deviation.

Questions and answers: Planning delivery slots

How long should a delivery slot be?

Long enough for traffic and plant loading time, short enough to keep the crane schedule workable. For many sites that is a window of a few hours – we agree it per route.

Who pays if the vehicle has to wait?

How waiting time is charged is set out in the quote. A well-coordinated slot usually avoids it.

What should the site report before delivery?

Whether crane, unloading area and contact are ready – and any shift in the schedule as soon as it is foreseeable.

Request

Request for this topic: Planning delivery slots

Three steps. Anything you do not know yet can be left open.

Details for planning

  • Crane plan
  • Unloading time
  • Contact
  • Rule for postponements

Prefer to talk directly?

+49 30 346 467 850info@logisticoo.comMon–Fri 8am–6pm Berlin time (CET/CEST)

Route and delivery date

Collection
Construction site

We check every route and come back with a proposal.

Delivery date
Is there a fixed delivery time window? (optional)

What is being delivered?

Dimensions of the largest piece (L × W × H)
Total weight
Unloading at the site

We check per request what is possible at your site.

Access to the site (optional)

You can send site plans, load lists or photos of the access after our first reply.

Contact and review

Anything that matters for planning.

Your details at a glance

Please review your details. “Edit” takes you back to the step; nothing is lost.