Guides
No-parking zones for site deliveries
If the site is on the street, the truck needs space in the public road while unloading – sometimes also for a loader crane's outriggers. In Germany, before works that affect road traffic, contractors must obtain orders from the responsible authority on how the work area is to be closed off and marked (section 45(6) StVO). This is usually organised by the site; we state how much space the vehicle needs.
What matters
- Who applies
- Usually the client or the executing contractor.
- Which space
- Vehicle length plus room to manoeuvre and for outriggers.
- Clarify early
- Procedures and lead times differ by city – ask early.
- Signs
- Put up in time, otherwise cars will be parked there.
Planning questions
We clarify these points before quoting – the earlier they are known, the more precise the plan.
- Is there already a no-parking zone or order?
- For what period?
- How long and wide is the space?
- Does the crane need extra space?
What we need from you
- The site's permits
- Period
- Dimensions of the space
- Crane requirement
Preparation: Installation, fitting and distribution inside the building are done by your team. We deliver to the agreed, accessible unloading point – unloading scope, waiting time and returns are set out in the quote.
What we do for you
What we organise
- Transport of building materials and elements within standard limits – from plant or merchant to site
- Delivery in the agreed slot, with notice and a fixed contact
- Crane truck, truck-mounted forklift or inloader can be organised via partners, by arrangement
Good to know
Deadlines and fees differ by city and authority. Enquire early with the responsible office.
Further reading: Applying for a no-parking zone or loading bay in Berlin – guide
How it works
- 01
Request
You send collection point, site, date and load details using the form below – anything unknown can stay open.
- 02
Review
We state the space needed by vehicle and crane and plan the slot to suit the permit.
- 03
Quote
You receive a quote with a clear scope: transport, delivery slot, unloading and any return runs.
- 04
Execution
Delivery within the permitted period, unloading from the reserved space.
Questions and answers: No-parking zone and kerb space
Who has to apply for the no-parking zone in front of the site?
Usually the client or the executing contractor, with the responsible authority. We provide the details of the space required.
How much space does a truck need for unloading?
That depends on vehicle and unloading. A crane truck also needs room for outriggers – we state the dimensions per request.
What if cars are parked there despite the no-parking zone?
Then the vehicle cannot unload as planned. The site should check the space before the slot and have it cleared if necessary.
Request
Request for this topic: No-parking zone and kerb space
Three steps. Anything you do not know yet can be left open.
Details for planning
- The site's permits
- Period
- Dimensions of the space
- Crane requirement