Goods receipt and damage documentation

Whether damage occurred in transit, during unloading or only afterwards can hardly be clarified later – unless it was recorded at handover. For glass, façades and windows the rule is: look closely before signing and note every visible defect immediately.

What matters

Visual check
During or straight after unloading, not at installation.
Note
Record visible damage specifically on the delivery note.
Photos
Photograph damage, rack and load.
Report
Report it to us and the supplier at once.

Planning questions

We clarify these points before quoting – the earlier they are known, the more precise the plan.

  1. Who checks the goods on receipt?
  2. How much time is planned for checking?
  3. How are photos sent?
  4. Who is the contact at the supplier?

What we need from you

  • Receiving person
  • Scope of check
  • Reporting route
  • Supplier contact

Preparation: Installation, fitting and distribution inside the building are done by your team. We deliver to the agreed, accessible unloading point – unloading scope, waiting time and returns are set out in the quote.

What we do for you

What we organise

  • Transport of building materials and elements within standard limits – from plant or merchant to site
  • Delivery in the agreed slot, with notice and a fixed contact
  • Crane truck, truck-mounted forklift or inloader can be organised via partners, by arrangement

Good to know

Do not just sign “subject to inspection” without stating what you noticed. A specific note helps far more.

How it works

  1. 01

    Request

    You send collection point, site, date and load details using the form below – anything unknown can stay open.

  2. 02

    Review

    We clarify in advance who receives and how anything unusual is reported.

  3. 03

    Quote

    You receive a quote with a clear scope: transport, delivery slot, unloading and any return runs.

  4. 04

    Execution

    Handover with visual check, note and photos if anything is unusual.

Questions and answers: Receipt and damage records

What do I do if something is damaged on delivery?

Note the damage specifically on the delivery note, take photos and inform us at once. Do not install the damaged piece.

Is a general reservation on the delivery note enough?

A specific note is better: which piece, what damage. A general reservation helps little.

What if the damage is only found later?

A visual check does not reveal every defect. For domestic transport under German law, hidden damage must be reported in text form within seven days of delivery (section 438 HGB) – otherwise delivery in good condition is generally presumed.

Request

Request for this topic: Receipt and damage records

Three steps. Anything you do not know yet can be left open.

Details for planning

  • Receiving person
  • Scope of check
  • Reporting route
  • Supplier contact

Prefer to talk directly?

+49 30 346 467 850info@logisticoo.comMon–Fri 8am–6pm Berlin time (CET/CEST)

Route and delivery date

Collection
Construction site

We check every route and come back with a proposal.

Delivery date
Is there a fixed delivery time window? (optional)

What is being delivered?

Dimensions of the largest piece (L × W × H)
Total weight
Unloading at the site

We check per request what is possible at your site.

Access to the site (optional)

You can send site plans, load lists or photos of the access after our first reply.