Transport for metalwork fabricators

Metalworkers fabricate railings, steel stairs, canopies, balconies and façade substructures – often galvanised or powder-coated, often bulky and not stackable. We organise transport to site so coatings stay intact and the pieces arrive where your installation team needs them.

What matters

Bulky
Irregular pieces need their own supports and securing.
Coating
Protect powder coating and galvanising from chafing.
Crane
Heavy stairs and canopies by crane truck, via partners.
Date
Delivery for the installation date.

Planning questions

We clarify these points before quoting – the earlier they are known, the more precise the plan.

  1. Which pieces, with dimensions and weights?
  2. Are they coated?
  3. How is unloading done?
  4. When is installation?

What we need from you

  • Parts list
  • Largest piece
  • Unloading
  • Installation date

Preparation: Installation, fitting and distribution inside the building are done by your team. We deliver to the agreed, accessible unloading point – unloading scope, waiting time and returns are set out in the quote.

What we do for you

What we organise

  • Transport of building materials and elements within standard limits – from plant or merchant to site
  • Delivery in the agreed slot, with notice and a fixed contact
  • Crane truck, truck-mounted forklift or inloader can be organised via partners, by arrangement

Good to know

Large steel structures and pieces above standard size are planned separately as abnormal loads.

How it works

  1. 01

    Request

    You send collection point, site, date and load details using the form below – anything unknown can stay open.

  2. 02

    Review

    We check pieces, dimensions and unloading and choose the vehicle.

  3. 03

    Quote

    You receive a quote with a clear scope: transport, delivery slot, unloading and any return runs.

  4. 04

    Execution

    Collection at the workshop, secured transport, delivery for the installation date.

Questions and answers: Metalwork fabricators

How are coated steel parts protected?

With interlayers, edge protection and straps that do not chafe – and a load in which pieces do not rub together.

Can a steel stair be lifted in by crane truck?

If weight, distance and standing position fit – crane trucks can be organised via partners. Fitting is done by your team.

Do you deliver small quantities too?

Yes. For smaller pieces we check a shared run without reloading.

Request

Request for this topic: Metalwork fabricators

Three steps. Anything you do not know yet can be left open.

Details for planning

  • Parts list
  • Largest piece
  • Unloading
  • Installation date

Prefer to talk directly?

+49 30 346 467 850info@logisticoo.comMon–Fri 8am–6pm Berlin time (CET/CEST)

Route and delivery date

Collection
Construction site

We check every route and come back with a proposal.

Delivery date
Is there a fixed delivery time window? (optional)

What is being delivered?

Dimensions of the largest piece (L × W × H)
Total weight
Unloading at the site

We check per request what is possible at your site.

Access to the site (optional)

You can send site plans, load lists or photos of the access after our first reply.