Before panels or glass are installed, the façade needs its framework: mullion and transom profiles, support rails, brackets and fixings. Profiles are long, often anodised or coated and arrive bundled; small parts come in crates. Bundle length decides the vehicle.

What matters

Long goods
Profile length determines deck length and any overhang.
Bundles
Profiles bundled with interlayers against chafing.
Coatings
Anodised and powder-coated profiles scratch easily.
Small parts
Brackets and fixings in crates with a delivery list.

Planning questions

We clarify these points before quoting – the earlier they are known, the more precise the plan.

  1. Which profile lengths, how many bundles?
  2. Are the surfaces coated?
  3. Are there small parts in crates?
  4. How is it unloaded?

What we need from you

  • Longest profile and number of bundles
  • Weight
  • Small parts
  • Unloading

Preparation: Installation, fitting and distribution inside the building are done by your team. We deliver to the agreed, accessible unloading point – unloading scope, waiting time and returns are set out in the quote.

What we do for you

What we organise

  • Transport of building materials and elements within standard limits – from plant or merchant to site
  • Delivery in the agreed slot, with notice and a fixed contact
  • Crane truck, truck-mounted forklift or inloader can be organised via partners, by arrangement

Good to know

We organise scheduled transport of building materials and elements within the permitted vehicle, load and weight limits. If a shipment needs heavy or out-of-gauge transport because of its dimensions or loads, we plan it separately as an abnormal load.

How it works

  1. 01

    Request

    You send collection point, site, date and load details using the form below – anything unknown can stay open.

  2. 02

    Review

    We check lengths, weight and unloading and choose the vehicle.

  3. 03

    Quote

    You receive a quote with a clear scope: transport, delivery slot, unloading and any return runs.

  4. 04

    Execution

    Collection bundled, secured transport, unloading at the agreed storage point.

Questions and answers: Façade profiles and substructure

How long may profiles be on the truck?

That depends on the vehicle. If the load projects beyond the vehicle, rules on overhang and marking apply – tell us the longest length and we check.

Are coated profiles protected?

Yes, through packaging, interlayers and straps with edge protection so nothing chafes.

Can profiles and panels travel together?

Yes, if the load is planned so heavy packs do not rest on profile bundles.

Request

Request for this topic: Façade profiles and substructure

Three steps. Anything you do not know yet can be left open.

Details for planning

  • Longest profile and number of bundles
  • Weight
  • Small parts
  • Unloading

Prefer to talk directly?

+49 30 346 467 850info@logisticoo.comMon–Fri 8am–6pm Berlin time (CET/CEST)

Route and delivery date

Collection
Construction site

We check every route and come back with a proposal.

Delivery date
Is there a fixed delivery time window? (optional)

What is being delivered?

Dimensions of the largest piece (L × W × H)
Total weight
Unloading at the site

We check per request what is possible at your site.

Access to the site (optional)

You can send site plans, load lists or photos of the access after our first reply.