Baustoff-Logistik

Materials

Transporting metal sandwich panels

Sandwich panels with metal faces and an insulating core form the envelope of many halls. They come in long packs that must rest at the manufacturer's specified support spacing so nothing bends or dents. Depending on pack length and manufacturer specification, unloading is by crane with spreader beam or by forklift – the site decides with the installer.

What matters

Pack length
Long packs determine vehicle length and support.
Support
Bearers at the specified spacing – no sagging.
Surfaces
Do not damage protective film and coated edges.
Unloading
Crane with spreader beam or forklift – by pack length and manufacturer specification.

Planning questions

We clarify these points before quoting – the earlier they are known, the more precise the plan.

  1. Which pack lengths and weights?
  2. How many packs?
  3. How is unloading done?
  4. Is there a level storage area?

What we need from you

  • Pack list with lengths
  • Weight
  • Unloading
  • Storage area

Preparation: Installation, fitting and distribution inside the building are done by your team. We deliver to the agreed, accessible unloading point – unloading scope, waiting time and returns are set out in the quote.

What we do for you

What we organise

  • Transport of building materials and elements within standard limits – from plant or merchant to site
  • Delivery in the agreed slot, with notice and a fixed contact
  • Crane truck, truck-mounted forklift or inloader can be organised via partners, by arrangement

Good to know

We organise scheduled transport of building materials and elements within the permitted vehicle, load and weight limits. If a shipment needs heavy or out-of-gauge transport because of its dimensions or loads, we plan it separately as an abnormal load.

How it works

  1. 01

    Request

    You send collection point, site, date and load details using the form below – anything unknown can stay open.

  2. 02

    Review

    We check pack lengths, weight and unloading and choose the vehicle.

  3. 03

    Quote

    You receive a quote with a clear scope: transport, delivery slot, unloading and any return runs.

  4. 04

    Execution

    Collection of the packs, secured transport, unloading at the storage area as agreed.

Questions and answers: Metal sandwich panels

How are sandwich packs supported?

On bearers at the spacing specified by the manufacturer, so long thin-skinned elements do not sag or dent. Straps are placed as specified.

Who provides the spreader beam for unloading?

Usually the installer or the crane partner. We clarify that beforehand in the quote.

How long may sandwich packs be?

That depends on the vehicle. If they exceed the permitted length, we plan an abnormal load separately.

Request

Request for this topic: Metal sandwich panels

Three steps. Anything you do not know yet can be left open.

Details for planning

  • Pack list with lengths
  • Weight
  • Unloading
  • Storage area

Prefer to talk directly?

+49 30 346 467 850info@logisticoo.comMon–Fri 8am–6pm Berlin time (CET/CEST)

Route and delivery date

Collection
Construction site

We check every route and come back with a proposal.

Delivery date
Is there a fixed delivery time window? (optional)

What is being delivered?

Dimensions of the largest piece (L × W × H)
Total weight
Unloading at the site

We check per request what is possible at your site.

Access to the site (optional)

You can send site plans, load lists or photos of the access after our first reply.

Contact and review

Anything that matters for planning.

Your details at a glance

Please review your details. “Edit” takes you back to the step; nothing is lost.