Materials
Precast concrete transport in standard size
We transport precast concrete as a scheduled site delivery: floor slabs, twin walls, stairs, balcony slabs or manhole components from the precast plant to site – loaded to the plant's specifications and in installation order. If vehicle and load stay within the general limits for dimensions, gross weight and axle loads, no permit is normally needed; anything beyond is an abnormal load and is planned separately.
Where the line to an abnormal load lies is explained in standard or abnormal load.
What matters
- Plant specifications
- Weights, lifting points, stacking and spacers are specified by the precast plant. We load and secure according to these details.
- Flat, upright or in a rack
- Slabs usually travel stacked flat, walls often upright in a rack or on an inloader. The loading method determines the vehicle.
- Checking standard limits
- In Germany the general limits are 2.55 m width and 4.00 m height for vehicle and load together. Whether a part stays below them also depends on how it is loaded.
- Crane unloading
- Precast parts are usually placed directly from the vehicle by the site's own crane; a crane truck is possible by arrangement. Crane, slinger and delivery slot have to fit together.
Planning questions
We clarify these points before quoting – the earlier they are known, the more precise the plan.
- Which precast parts are they – slabs, walls, stairs, manhole components?
- What dimensions and weight does the largest part have?
- Is there an installation or laying plan with a sequence?
- Who provides crane and slinger on site?
What we need from you
- Parts list with dimensions and weights
- Precast plant and site
- Installation or laying plan
- Crane slot and access to the crane position
Preparation: Installation, fitting and distribution inside the building are done by your team. We deliver to the agreed, accessible unloading point – unloading scope, waiting time and returns are set out in the quote.
What we do for you
What we organise
- Transport of building materials and elements within standard limits – from plant or merchant to site
- Delivery in the agreed slot, with notice and a fixed contact
- Crane truck, truck-mounted forklift or inloader can be organised via partners, by arrangement
Good to know
We organise scheduled transport of building materials and elements within the permitted vehicle, load and weight limits. If a shipment needs heavy or out-of-gauge transport because of its dimensions or loads, we plan it separately as an abnormal load.
How it works
- 01
Request
You send collection point, site, date and load details using the form below – anything unknown can stay open.
- 02
Review
We check the parts list, loading method and dimensions against standard limits, the access to the crane position and the installation rhythm, then plan vehicles and call-offs.
- 03
Quote
You receive a quote with a clear scope: transport, delivery slot, unloading and any return runs.
- 04
Execution
Loading at the plant to plant specifications and installation order, delivery in the agreed slot, handover from the vehicle to the crane.
Questions and answers: Precast concrete
How is precast concrete transported?
As the precast plant specifies: slabs mostly stacked flat with spacers, walls often upright in a rack or on an inloader, in each case secured against shifting and tipping.
When does precast transport become an abnormal load?
When vehicle and load together exceed the general limits – in Germany 2.55 m width and 4.00 m height – or length, gross weight and axle loads require it. Depending on the case a permit or exemption is then needed, and we plan the transport separately.
Who unloads the precast parts on site?
Usually the site crane with a slinger from the site team. A crane truck is possible for lighter parts by arrangement; weights and lifting points come from the plant.
Request
Request for this topic: Precast concrete
Three steps. Anything you do not know yet can be left open.
Details for planning
- Parts list with dimensions and weights
- Precast plant and site
- Installation or laying plan
- Crane slot and access to the crane position