Transporting precast floor slabs
Filigree slabs are thin precast plates with lattice girders that are laid on site and completed with in-situ concrete. They arrive stacked with timber spacers, in the order of the laying plan, and are usually laid straight from the vehicle with the site crane. Plannable delivery in installation pace matters more here than the single run.
What matters
- Stacking
- Slabs stacked flat, spacers as specified by the plant.
- Laying plan
- Loading sequence by bays and position numbers.
- Crane unloading
- Usually straight from the vehicle to the site crane.
- Pace
- Delivery per floor or section, coordinated with the foreman.
Planning questions
We clarify these points before quoting – the earlier they are known, the more precise the plan.
- Is there a laying plan with positions?
- How many slabs per floor, which dimensions?
- Are they laid straight from the vehicle?
- When is the crane free?
What we need from you
- Laying plan
- Slab list with dimensions and weights
- Crane slot
- Access to the crane position
Preparation: Installation, fitting and distribution inside the building are done by your team. We deliver to the agreed, accessible unloading point – unloading scope, waiting time and returns are set out in the quote.
What we do for you
What we organise
- Transport of building materials and elements within standard limits – from plant or merchant to site
- Delivery in the agreed slot, with notice and a fixed contact
- Crane truck, truck-mounted forklift or inloader can be organised via partners, by arrangement
Good to know
We organise scheduled transport of building materials and elements within the permitted vehicle, load and weight limits. If a shipment needs heavy or out-of-gauge transport because of its dimensions or loads, we plan it separately as an abnormal load.
How it works
- 01
Request
You send collection point, site, date and load details using the form below – anything unknown can stay open.
- 02
Review
We check slab list, access and crane pace and plan vehicles and call-offs.
- 03
Quote
You receive a quote with a clear scope: transport, delivery slot, unloading and any return runs.
- 04
Execution
Loading at the plant in laying order, delivery for the crane slot, handover from the vehicle.
Questions and answers: Precast floor slabs
How are filigree slabs loaded?
Stacked flat with timber spacers as the plant specifies, and in the order in which they are laid.
Can they be laid straight from the truck?
Yes, that is common – if crane, crew and delivery slot are coordinated. Waiting time is set out in the quote.
Who specifies weights and lifting points?
The precast plant. We load and secure according to its information.
Request
Request for this topic: Precast floor slabs
Three steps. Anything you do not know yet can be left open.
Details for planning
- Laying plan
- Slab list with dimensions and weights
- Crane slot
- Access to the crane position