Transporting precast floor slabs

Filigree slabs are thin precast plates with lattice girders that are laid on site and completed with in-situ concrete. They arrive stacked with timber spacers, in the order of the laying plan, and are usually laid straight from the vehicle with the site crane. Plannable delivery in installation pace matters more here than the single run.

What matters

Stacking
Slabs stacked flat, spacers as specified by the plant.
Laying plan
Loading sequence by bays and position numbers.
Crane unloading
Usually straight from the vehicle to the site crane.
Pace
Delivery per floor or section, coordinated with the foreman.

Planning questions

We clarify these points before quoting – the earlier they are known, the more precise the plan.

  1. Is there a laying plan with positions?
  2. How many slabs per floor, which dimensions?
  3. Are they laid straight from the vehicle?
  4. When is the crane free?

What we need from you

  • Laying plan
  • Slab list with dimensions and weights
  • Crane slot
  • Access to the crane position

Preparation: Installation, fitting and distribution inside the building are done by your team. We deliver to the agreed, accessible unloading point – unloading scope, waiting time and returns are set out in the quote.

What we do for you

What we organise

  • Transport of building materials and elements within standard limits – from plant or merchant to site
  • Delivery in the agreed slot, with notice and a fixed contact
  • Crane truck, truck-mounted forklift or inloader can be organised via partners, by arrangement

Good to know

We organise scheduled transport of building materials and elements within the permitted vehicle, load and weight limits. If a shipment needs heavy or out-of-gauge transport because of its dimensions or loads, we plan it separately as an abnormal load.

How it works

  1. 01

    Request

    You send collection point, site, date and load details using the form below – anything unknown can stay open.

  2. 02

    Review

    We check slab list, access and crane pace and plan vehicles and call-offs.

  3. 03

    Quote

    You receive a quote with a clear scope: transport, delivery slot, unloading and any return runs.

  4. 04

    Execution

    Loading at the plant in laying order, delivery for the crane slot, handover from the vehicle.

Questions and answers: Precast floor slabs

How are filigree slabs loaded?

Stacked flat with timber spacers as the plant specifies, and in the order in which they are laid.

Can they be laid straight from the truck?

Yes, that is common – if crane, crew and delivery slot are coordinated. Waiting time is set out in the quote.

Who specifies weights and lifting points?

The precast plant. We load and secure according to its information.

Request

Request for this topic: Precast floor slabs

Three steps. Anything you do not know yet can be left open.

Details for planning

  • Laying plan
  • Slab list with dimensions and weights
  • Crane slot
  • Access to the crane position

Prefer to talk directly?

+49 30 346 467 850info@logisticoo.comMon–Fri 8am–6pm Berlin time (CET/CEST)

Route and delivery date

Collection
Construction site

We check every route and come back with a proposal.

Delivery date
Is there a fixed delivery time window? (optional)

What is being delivered?

Dimensions of the largest piece (L × W × H)
Total weight
Unloading at the site

We check per request what is possible at your site.

Access to the site (optional)

You can send site plans, load lists or photos of the access after our first reply.

Contact and review

Anything that matters for planning.

Your details at a glance

Please review your details. “Edit” takes you back to the step; nothing is lost.