Manhole components and concrete pipes

In civil engineering, concrete manhole rings, cones, bases and pipes often go where there is no road yet: to the trench, onto gravel, into a field. Round items must be secured against rolling, and unloading is usually by crane right beside the installation point.

What matters

Rolling
Secure pipes and rings against rolling with chocks and straps.
Crane
Usually unloaded by crane truck or excavator with lifting gear.
Terrain
Check access over site roads or unpaved ground beforehand.
Piece weight
Manhole bases are heavy – know the weight of each piece.

Planning questions

We clarify these points before quoting – the earlier they are known, the more precise the plan.

  1. Which pieces, which diameters and weights?
  2. What is access to the unloading point like?
  3. Who lifts – excavator on site or crane truck?
  4. Where exactly are they placed?

What we need from you

  • Parts list with weights
  • Access and ground
  • Lifting options
  • Set-down point

Preparation: Installation, fitting and distribution inside the building are done by your team. We deliver to the agreed, accessible unloading point – unloading scope, waiting time and returns are set out in the quote.

What we do for you

What we organise

  • Transport of building materials and elements within standard limits – from plant or merchant to site
  • Delivery in the agreed slot, with notice and a fixed contact
  • Crane truck, truck-mounted forklift or inloader can be organised via partners, by arrangement

Good to know

Unloading with the excavator on site is possible if the machine is suitable and approved for it and lifting gear is available. Clarify this with your site manager.

How it works

  1. 01

    Request

    You send collection point, site, date and load details using the form below – anything unknown can stay open.

  2. 02

    Review

    We check weights, access and lifting options and plan vehicle and unloading.

  3. 03

    Quote

    You receive a quote with a clear scope: transport, delivery slot, unloading and any return runs.

  4. 04

    Execution

    Delivery in the agreed slot, unloading as agreed beside the installation point.

Questions and answers: Manhole components and pipes

How are concrete pipes secured on the truck?

With chocks or cradles against rolling and with straps according to load-securing rules.

Can a truck drive up to the trench?

Only if site road and ground can bear it and safety distances to the trench edge or shoring are kept. Site management assesses this; photos help us choose the vehicle.

Who slings the manhole rings?

We set that beforehand – depending on the lifting equipment, your staff or those of the crane-truck partner.

Request

Request for this topic: Manhole components and pipes

Three steps. Anything you do not know yet can be left open.

Details for planning

  • Parts list with weights
  • Access and ground
  • Lifting options
  • Set-down point

Prefer to talk directly?

+49 30 346 467 850info@logisticoo.comMon–Fri 8am–6pm Berlin time (CET/CEST)

Route and delivery date

Collection
Construction site

We check every route and come back with a proposal.

Delivery date
Is there a fixed delivery time window? (optional)

What is being delivered?

Dimensions of the largest piece (L × W × H)
Total weight
Unloading at the site

We check per request what is possible at your site.

Access to the site (optional)

You can send site plans, load lists or photos of the access after our first reply.

Contact and review

Anything that matters for planning.