Services
Building material deliveries to several sites
Builders' merchants and contractors often supply several sites in one region. Instead of many half-empty runs we bundle the deliveries into one tour: the loading sequence follows the unloading order, and each stop gets its own notice and delivery note.
What matters
- Loading sequence
- What is unloaded first sits at the back or on top.
- Per stop
- Own consignee, own papers, own slot.
- Unloading equipment
- The tour needs an unloading method that works at every stop.
- Order
- Stop order based on slots and route.
Planning questions
We clarify these points before quoting – the earlier they are known, the more precise the plan.
- How many stops, and where are they?
- Which goods go to which stop?
- Are there fixed slots per site?
- How is unloading done at each stop?
What we need from you
- Stop list with addresses
- Goods per stop
- Slot per stop
- Unloading per stop
Preparation: Installation, fitting and distribution inside the building are done by your team. We deliver to the agreed, accessible unloading point – unloading scope, waiting time and returns are set out in the quote.
What we do for you
What we organise
- Transport of building materials and elements within standard limits – from plant or merchant to site
- Delivery in the agreed slot, with notice and a fixed contact
- Crane truck, truck-mounted forklift or inloader can be organised via partners, by arrangement
Good to know
The more fixed slots a tour has, the tighter it gets. Tell us which stops are flexible – that makes the tour more robust.
How it works
- 01
Request
You send collection point, site, date and load details using the form below – anything unknown can stay open.
- 02
Review
We check stops, slots and unloading and plan stop order and loading sequence.
- 03
Quote
You receive a quote with a clear scope: transport, delivery slot, unloading and any return runs.
- 04
Execution
Loading according to the tour plan, stops served in order, handover against delivery note at each stop.
Questions and answers: Multi-stop deliveries
Can deliveries to several sites be bundled?
Yes, if stops, goods and slots fit together. We plan the tour and loading sequence accordingly.
Does each site get its own delivery note?
Yes. Each stop receives its own papers and signs separately.
What happens if a stop cannot accept the goods?
We clarify with you at once whether the goods go back or are delivered later. The costs for this are set out in the quote.
Request
Request for this topic: Multi-stop deliveries
Three steps. Anything you do not know yet can be left open.
Details for planning
- Stop list with addresses
- Goods per stop
- Slot per stop
- Unloading per stop