Industries
Material deliveries for fit-out and drywall trades
Fit-out trades arrive when the building stands – and then material has to get into the building in large quantities and dry. Boards, studs and insulation are used floor by floor. We deliver on call-off, matched to the site hoist or crane time, and unload at the agreed point; bringing it into the floors is done by your team.
What matters
- Dry
- Boards and insulation under tarpaulin, handover at a dry spot.
- Floor by floor
- Call-off per floor or section.
- Bringing in
- Keep the site's hoist or crane time in mind.
- City centre
- Many fit-out sites are tight – clarify standing space.
Planning questions
We clarify these points before quoting – the earlier they are known, the more precise the plan.
- Which material per section?
- Is there a site hoist or crane time?
- Where is unloading?
- How often do you call off?
What we need from you
- Material list per section
- Way of bringing material in
- Unloading point
- Call-off rhythm
Preparation: Installation, fitting and distribution inside the building are done by your team. We deliver to the agreed, accessible unloading point – unloading scope, waiting time and returns are set out in the quote.
What we do for you
What we organise
- Transport of building materials and elements within standard limits – from plant or merchant to site
- Delivery in the agreed slot, with notice and a fixed contact
- Crane truck, truck-mounted forklift or inloader can be organised via partners, by arrangement
Good to know
Setting down by crane on floor levels is only possible by agreement and with the site's approval.
How it works
- 01
Request
You send collection point, site, date and load details using the form below – anything unknown can stay open.
- 02
Review
We check material, unloading point and bringing-in and plan runs by call-off.
- 03
Quote
You receive a quote with a clear scope: transport, delivery slot, unloading and any return runs.
- 04
Execution
Delivery in the slot, unloading at the agreed point, handover against delivery note.
Questions and answers: Fit-out trades
Do you deliver boards straight to the floor?
Not as standard. We unload at the agreed point; setting down on floor levels only by explicit agreement.
Can material be called off by floor?
Yes. We plan the runs according to your call-off per floor or section.
What if the site hoist is busy at delivery time?
Align the slot with the hoist schedule. Waiting time is set out in the quote.
Request
Request for this topic: Fit-out trades
Three steps. Anything you do not know yet can be left open.
Details for planning
- Material list per section
- Way of bringing material in
- Unloading point
- Call-off rhythm