Recurring construction site supply

Large sites need not one delivery but many: blocks during the shell phase, boards and insulation during fit-out, the façade at the end. Instead of requesting each run anew, we agree a rhythm – fixed delivery days or call-offs with notice – and adjust it to progress on site. Scope and terms are set by arrangement.

What matters

Rhythm
Fixed weekdays or call-off with agreed notice.
One contact
Changes go to one place, not to changing dispatchers.
Grows with the job
Quantities and goods change with the phase – so does the plan.
Transparency
Delivery notes and handovers documented for each run.

Planning questions

We clarify these points before quoting – the earlier they are known, the more precise the plan.

  1. Over what period does the site run?
  2. Which goods in which phase?
  3. Fixed delivery days or call-off?
  4. Who may call off and make changes?

What we need from you

  • Construction period
  • Product groups per phase
  • Delivery rhythm
  • Authorised callers

Preparation: Installation, fitting and distribution inside the building are done by your team. We deliver to the agreed, accessible unloading point – unloading scope, waiting time and returns are set out in the quote.

What we do for you

What we organise

  • Transport of building materials and elements within standard limits – from plant or merchant to site
  • Delivery in the agreed slot, with notice and a fixed contact
  • Crane truck, truck-mounted forklift or inloader can be organised via partners, by arrangement

Good to know

A framework saves coordination – but only if changes are reported early. Agree a fixed call-off channel and a notice period.

How it works

  1. 01

    Request

    You send collection point, site, date and load details using the form below – anything unknown can stay open.

  2. 02

    Review

    We check quantities, route and unloading situation and propose a delivery rhythm.

  3. 03

    Quote

    You receive a quote with a clear scope: transport, delivery slot, unloading and any return runs.

  4. 04

    Execution

    Deliveries by plan or call-off, regular alignment with site management, adjustments when things change.

Questions and answers: Recurring site supply

Can I pre-plan deliveries for a whole phase?

Yes. We agree a rhythm or call-offs with notice and adjust it when the construction schedule changes.

How do I call off a delivery?

Through the agreed channel – by phone or e-mail to a fixed contact, with the agreed notice.

Is there a framework contract for this?

Scope and terms of regular deliveries are agreed individually. Contact us with period and quantities.

Request

Request for this topic: Recurring site supply

Three steps. Anything you do not know yet can be left open.

Details for planning

  • Construction period
  • Product groups per phase
  • Delivery rhythm
  • Authorised callers

Prefer to talk directly?

+49 30 346 467 850info@logisticoo.comMon–Fri 8am–6pm Berlin time (CET/CEST)

Route and delivery date

Collection
Construction site

We check every route and come back with a proposal.

Delivery date
Is there a fixed delivery time window? (optional)

What is being delivered?

Dimensions of the largest piece (L × W × H)
Total weight
Unloading at the site

We check per request what is possible at your site.

Access to the site (optional)

You can send site plans, load lists or photos of the access after our first reply.

Contact and review

Anything that matters for planning.

Your details at a glance

Please review your details. “Edit” takes you back to the step; nothing is lost.