Baustoff-Logistik

Services

Direct delivery from plant to site

Every reload is a risk for glass, façades and fair-faced concrete. On a direct run the load stays on the same vehicle from the plant gate to the site. We match the loading slot at the plant with the delivery slot on site – as part or full load, depending on quantity.

What matters

No transhipment
No interim storage, no reloading – less risk of damage.
Two slots
Loading slot at the plant and delivery slot on site fit together.
Part or full load
Depending on quantity, a dedicated vehicle or shared with a suitable load.
Predictable
Fixed collection time, clear route, one delivery note.

Planning questions

We clarify these points before quoting – the earlier they are known, the more precise the plan.

  1. When can loading take place at the plant?
  2. When should it arrive on site?
  3. How much loading space is needed?
  4. How is it unloaded at destination?

What we need from you

  • Plant with loading times
  • Site with delivery slot
  • Size of load
  • Unloading

Preparation: Installation, fitting and distribution inside the building are done by your team. We deliver to the agreed, accessible unloading point – unloading scope, waiting time and returns are set out in the quote.

What we do for you

What we organise

  • Transport of building materials and elements within standard limits – from plant or merchant to site
  • Delivery in the agreed slot, with notice and a fixed contact
  • Crane truck, truck-mounted forklift or inloader can be organised via partners, by arrangement

Good to know

Direct runs pay off especially for sensitive, time-bound goods. For small quantities we check whether a shared run without reloading is possible.

How it works

  1. 01

    Request

    You send collection point, site, date and load details using the form below – anything unknown can stay open.

  2. 02

    Review

    We check loading slot, route and unloading and plan vehicle and departure time.

  3. 03

    Quote

    You receive a quote with a clear scope: transport, delivery slot, unloading and any return runs.

  4. 04

    Execution

    Loading at the plant, direct run without transhipment, delivery in the agreed slot.

Questions and answers: Direct plant-to-site run

Is a direct run always a full load?

No. Part loads can also travel without transhipment if the rest of the load suits the route. We check this per request.

Why is a direct run sensible for glass and façades?

Because every reload is an additional risk for edges and surfaces. Without transhipment the load stays secured as it was loaded at the plant.

Can you collect from several plants?

Yes, if route and loading sequence fit. We then plan a collection run in a fixed order.

Request

Request for this topic: Direct plant-to-site run

Three steps. Anything you do not know yet can be left open.

Details for planning

  • Plant with loading times
  • Site with delivery slot
  • Size of load
  • Unloading

Prefer to talk directly?

+49 30 346 467 850info@logisticoo.comMon–Fri 8am–6pm Berlin time (CET/CEST)

Route and delivery date

Collection
Construction site

We check every route and come back with a proposal.

Delivery date
Is there a fixed delivery time window? (optional)

What is being delivered?

Dimensions of the largest piece (L × W × H)
Total weight
Unloading at the site

We check per request what is possible at your site.

Access to the site (optional)

You can send site plans, load lists or photos of the access after our first reply.

Contact and review

Anything that matters for planning.

Your details at a glance

Please review your details. “Edit” takes you back to the step; nothing is lost.