Transporting unitised façades
Unitised façades arrive on site as finished, usually storey-high units about one window bay wide and are installed there floor by floor from the bottom up. For transport this means many similar, sensitive elements that have to arrive in the right order and without damage to glass and frame.
What matters
- Storey-high
- Element height and rack determine vehicle height.
- Many units
- Similar elements in series – loading sequence by bays and floors.
- Glass and frame
- Glazed units are doubly sensitive: edge and surface.
- Installation pace
- Delivery per floor, aligned with crane and crew.
Planning questions
We clarify these points before quoting – the earlier they are known, the more precise the plan.
- How many elements per floor?
- What dimensions and weights?
- On which racks are they delivered?
- How and where are they unloaded?
What we need from you
- Element list
- Rack system
- Installation plan per floor
- Unloading
Preparation: Installation, fitting and distribution inside the building are done by your team. We deliver to the agreed, accessible unloading point – unloading scope, waiting time and returns are set out in the quote.
What we do for you
What we organise
- Transport of building materials and elements within standard limits – from plant or merchant to site
- Delivery in the agreed slot, with notice and a fixed contact
- Crane truck, truck-mounted forklift or inloader can be organised via partners, by arrangement
Good to know
We organise scheduled transport of building materials and elements within the permitted vehicle, load and weight limits. If a shipment needs heavy or out-of-gauge transport because of its dimensions or loads, we plan it separately as an abnormal load.
How it works
- 01
Request
You send collection point, site, date and load details using the form below – anything unknown can stay open.
- 02
Review
We check elements, racks and installation plan and plan vehicles and delivery order.
- 03
Quote
You receive a quote with a clear scope: transport, delivery slot, unloading and any return runs.
- 04
Execution
Loading at the plant in installation order, transport, delivery per call-off, unloading as agreed.
Questions and answers: Unitised façades
How are unitised façades delivered?
Usually upright on the manufacturer's racks, in the order of installation – often called off floor by floor.
Can they be installed straight from the vehicle?
That is for the façade contractor to decide with their crane and installation plan. We align delivery slot and loading sequence with it.
What happens to the empty racks?
On request we take them back with the next delivery – number and return point are agreed in the order.
Request
Request for this topic: Unitised façades
Three steps. Anything you do not know yet can be left open.
Details for planning
- Element list
- Rack system
- Installation plan per floor
- Unloading