Transporting cross-laminated timber (CLT)

Cross-laminated timber arrives on site as large, precisely cut wall and floor panels. They are loaded in installation order and placed by crane straight from the vehicle. Manufacturers set their own transport conditions; we plan vehicles and delivery slots accordingly.

What matters

Parts list
Each element has a position and installation time.
Loading sequence
What is placed first lies on top.
Moisture and edges
Covers and edge protection, especially for visible-grade faces.
Crane
Placed straight from the vehicle, lifting gear from the installer.

Planning questions

We clarify these points before quoting – the earlier they are known, the more precise the plan.

  1. Which panel formats and weights?
  2. Are there manufacturer transport conditions?
  3. Installed straight from the vehicle?
  4. How many runs on which days?

What we need from you

  • Parts list with dimensions and weights
  • Manufacturer specifications
  • Installation plan
  • Access to the crane position

Preparation: Installation, fitting and distribution inside the building are done by your team. We deliver to the agreed, accessible unloading point – unloading scope, waiting time and returns are set out in the quote.

What we do for you

What we organise

  • Transport of building materials and elements within standard limits – from plant or merchant to site
  • Delivery in the agreed slot, with notice and a fixed contact
  • Crane truck, truck-mounted forklift or inloader can be organised via partners, by arrangement

Good to know

We organise scheduled transport of building materials and elements within the permitted vehicle, load and weight limits. If a shipment needs heavy or out-of-gauge transport because of its dimensions or loads, we plan it separately as an abnormal load.

How it works

  1. 01

    Request

    You send collection point, site, date and load details using the form below – anything unknown can stay open.

  2. 02

    Review

    We check formats, manufacturer specifications and installation plan and plan the runs.

  3. 03

    Quote

    You receive a quote with a clear scope: transport, delivery slot, unloading and any return runs.

  4. 04

    Execution

    Loading at the plant in installation order, covered transport, delivery for the crane slot.

Questions and answers: Cross-laminated timber (CLT)

How are CLT panels loaded?

Usually stacked flat or upright on racks, in installation order – according to the manufacturer's specifications.

Who provides the lifting gear for placing?

Usually the installer. We clarify beforehand who slings and who takes over the load.

Can CLT panels be stored on site?

It is possible, but moisture and handling raise the risk. Installing straight from the vehicle is usually better.

Request

Request for this topic: Cross-laminated timber (CLT)

Three steps. Anything you do not know yet can be left open.

Details for planning

  • Parts list with dimensions and weights
  • Manufacturer specifications
  • Installation plan
  • Access to the crane position

Prefer to talk directly?

+49 30 346 467 850info@logisticoo.comMon–Fri 8am–6pm Berlin time (CET/CEST)

Route and delivery date

Collection
Construction site

We check every route and come back with a proposal.

Delivery date
Is there a fixed delivery time window? (optional)

What is being delivered?

Dimensions of the largest piece (L × W × H)
Total weight
Unloading at the site

We check per request what is possible at your site.

Access to the site (optional)

You can send site plans, load lists or photos of the access after our first reply.