Transport for timber construction companies

In timber construction, prefabrication decides the build time: when the elements are right and arrive on time, a house stands in a few days. We plan runs from your cutting plan and installation days, protect the elements from moisture and coordinate every delivery with your crane and crew.

What matters

Installation days
Runs by installation day and element order.
Moisture protection
Covers and little time between delivery and installation.
Straight from the vehicle
Placing from the truck saves interim storage.
Weather
Agree postponements early in bad weather.

Planning questions

We clarify these points before quoting – the earlier they are known, the more precise the plan.

  1. How many elements and installation days?
  2. Which element dimensions?
  3. Placed straight from the vehicle?
  4. Where is the crane?

What we need from you

  • Element list
  • Installation plan
  • Crane position
  • Access

Preparation: Installation, fitting and distribution inside the building are done by your team. We deliver to the agreed, accessible unloading point – unloading scope, waiting time and returns are set out in the quote.

What we do for you

What we organise

  • Transport of building materials and elements within standard limits – from plant or merchant to site
  • Delivery in the agreed slot, with notice and a fixed contact
  • Crane truck, truck-mounted forklift or inloader can be organised via partners, by arrangement

Good to know

Very long beams and over-width modules are abnormal loads and planned separately. Standard-size wall elements and CLT we plan as normal runs.

How it works

  1. 01

    Request

    You send collection point, site, date and load details using the form below – anything unknown can stay open.

  2. 02

    Review

    We check dimensions, installation plan and access and plan vehicles and departures.

  3. 03

    Quote

    You receive a quote with a clear scope: transport, delivery slot, unloading and any return runs.

  4. 04

    Execution

    Loading at the plant in sequence, delivery for the crane slot, handover from the vehicle.

Questions and answers: Timber construction

Can timber elements arrive early on installation day?

We plan the delivery slot around your installation start. How early is possible depends on route and access rules.

How many runs does a timber house need?

That depends on element sizes and number. With your element list we work out the runs.

What if it rains on installation day?

If you postpone installation, we postpone delivery. Let us know as early as possible.

Request

Request for this topic: Timber construction

Three steps. Anything you do not know yet can be left open.

Details for planning

  • Element list
  • Installation plan
  • Crane position
  • Access

Prefer to talk directly?

+49 30 346 467 850info@logisticoo.comMon–Fri 8am–6pm Berlin time (CET/CEST)

Route and delivery date

Collection
Construction site

We check every route and come back with a proposal.

Delivery date
Is there a fixed delivery time window? (optional)

What is being delivered?

Dimensions of the largest piece (L × W × H)
Total weight
Unloading at the site

We check per request what is possible at your site.

Access to the site (optional)

You can send site plans, load lists or photos of the access after our first reply.