Baustoff-Logistik

Materials

Transporting timber frame elements

Timber frame elements are prefabricated at the plant with insulation, sheathing and often windows already fitted, and erected on site in a few days. So that they arrive dry and undamaged, plants prefer to load them straight onto the vehicle and avoid storage on site. We plan the runs by the installation plan – element by element, day by day.

What matters

Moisture
Protect timber and insulation from rain – covers and weather-aware planning.
Direct loading
From the plant straight onto the vehicle, ideally without interim storage.
Loading sequence
By installation day and element order.
Dimensions
Element length and height decide whether it stays a normal transport.

Planning questions

We clarify these points before quoting – the earlier they are known, the more precise the plan.

  1. Which element dimensions and weights?
  2. How many installation days, how many runs?
  3. Upright on racks or flat?
  4. How is it unloaded?

What we need from you

  • Element list with dimensions
  • Installation plan
  • Loading method (upright/flat)
  • Unloading

Preparation: Installation, fitting and distribution inside the building are done by your team. We deliver to the agreed, accessible unloading point – unloading scope, waiting time and returns are set out in the quote.

What we do for you

What we organise

  • Transport of building materials and elements within standard limits – from plant or merchant to site
  • Delivery in the agreed slot, with notice and a fixed contact
  • Crane truck, truck-mounted forklift or inloader can be organised via partners, by arrangement

Good to know

We organise scheduled transport of building materials and elements within the permitted vehicle, load and weight limits. If a shipment needs heavy or out-of-gauge transport because of its dimensions or loads, we plan it separately as an abnormal load.

How it works

  1. 01

    Request

    You send collection point, site, date and load details using the form below – anything unknown can stay open.

  2. 02

    Review

    We check dimensions, loading method and installation plan and plan vehicles and departure times.

  3. 03

    Quote

    You receive a quote with a clear scope: transport, delivery slot, unloading and any return runs.

  4. 04

    Execution

    Loading at the plant in sequence, protected transport, delivery for the installation day.

Questions and answers: Timber frame elements

How are timber elements protected from rain?

Through the plant's packaging, tarpaulins and delivery as close to installation as possible. In bad weather we agree postponements early.

Do timber frame elements travel upright or flat?

Both happen, depending on element and plant. Upright walls need racks and affect vehicle height.

What if an element is too long for a normal truck?

Then it is an abnormal load. We plan it separately – with a permit where required.

Request

Request for this topic: Timber frame elements

Three steps. Anything you do not know yet can be left open.

Details for planning

  • Element list with dimensions
  • Installation plan
  • Loading method (upright/flat)
  • Unloading

Prefer to talk directly?

+49 30 346 467 850info@logisticoo.comMon–Fri 8am–6pm Berlin time (CET/CEST)

Route and delivery date

Collection
Construction site

We check every route and come back with a proposal.

Delivery date
Is there a fixed delivery time window? (optional)

What is being delivered?

Dimensions of the largest piece (L × W × H)
Total weight
Unloading at the site

We check per request what is possible at your site.

Access to the site (optional)

You can send site plans, load lists or photos of the access after our first reply.

Contact and review

Anything that matters for planning.