City · Spain
Building material transport to Madrid
Delivering from central Europe to Madrid means one of the longest overland routes on the continent. For sites in Madrid we therefore mainly organise deliveries where the journey pays off: façade elements, glass and specialist components that travel without transhipment straight from the plant to the site.
Madrid: economy and locations
In the north of the city Madrid Nuevo Norte is taking shape, an urban development stretching 5.6 kilometres from north to south and providing for almost 10,500 homes. Las Tablas Oeste, the first of four areas, leads the way with 741 homes.
A project of this length is built in sections over many years. For suppliers from abroad, the interesting items are components that are hard to source regionally – and that need careful handling over long distances.
Key facts
| Fact | Source |
|---|---|
| Madrid Nuevo Norte provides for almost 10,500 homes. | Madrid City Council, press release 26 March 2025 (As of 2025) |
| The project area stretches 5.6 kilometres from north to south. | El Independiente (As of 2025) |
| The first of the four areas, Las Tablas Oeste, comprises 741 homes. | Madrid City Council, press release 26 March 2025 (As of 2025) |
Typical shipments in Madrid
- Unitised façades and glass for office and residential buildings
- Specialist façade panels and profiles from central European plants
- Recurring deliveries per construction section
Things to note on site
The journey through France takes several days; we plan delivery day and slot accordingly and rely on direct runs without transhipment. On large sites we ask for the current construction section and its entrance.
Questions and answers: Madrid
Is a delivery from Germany to Madrid worthwhile?
For components that are hard to source regionally, often yes. We check whether a full or part load and which route fits.
How is glass protected on the long route?
With secured racks, a run without reloading and a handover with visual inspection.
Request
Request for Madrid
Three steps. Anything you do not know yet can be left open.
Details for planning
- Collection point and site with country
- Delivery date and whether a fixed slot applies
- Type of load: glass, façade, precast, timber, palletised goods
- Dimensions of the largest piece and total weight
- Unloading: available, crane truck, truck-mounted forklift or open
- Access to the site