Baustoff-Logistik

City · Spain

Building materials logistics for Barcelona

Barcelona has been converting former industrial land within the city for decades. For sites in Barcelona we organise deliveries of façade elements, glass and specialist components from central Europe – via France and the Pyrenees, without customs, as a direct run into a slot agreed in advance.

Barcelona: economy and locations

In the Poblenou district, the 22@ innovation district has been developing since its plan of 2000: 198.26 hectares of former industrial land where offices, universities and housing rise alongside preserved factory buildings. The street grid itself dates from Ildefons Cerdà's plan, approved in 1859.

Construction there takes place within the existing street grid, block by block – often as conversions of old industrial buildings. For logistics this means small, tightly enclosed sites in the middle of the district.

Key facts

FactSource
The 22@ innovation district in Poblenou covers 198.26 hectares of former industrial land.Gran Enciclopèdia Catalana, entry 22@
The plan was adopted in 2000.Gran Enciclopèdia Catalana, entry 22@
The Eixample street grid goes back to Ildefons Cerdà's plan, approved by royal decree in 1859.Gran Enciclopèdia Catalana, entry Pla Cerdà

Typical shipments in Barcelona

  • Unitised façades and glass for new office buildings
  • Façade panels and profiles for converting old factory buildings
  • Windows for residential perimeter blocks

Things to note on site

Sites within the block grid rarely have storage space; unloading is from the street, often by crane. The site should clarify standing space and access times beforehand. We plan the long journey through France with a realistic delivery day.

Questions and answers: Barcelona

How is unloading done in Barcelona's narrow streets?

Mostly from the street, by site crane or crane truck – with standing space reserved in advance.

How long does a delivery from Germany to Barcelona take?

That depends on collection point and route; it is a multi-day drive. We plan a realistic delivery day.

Request

Request for Barcelona

Three steps. Anything you do not know yet can be left open.

Details for planning

  • Collection point and site with country
  • Delivery date and whether a fixed slot applies
  • Type of load: glass, façade, precast, timber, palletised goods
  • Dimensions of the largest piece and total weight
  • Unloading: available, crane truck, truck-mounted forklift or open
  • Access to the site

Prefer to talk directly?

+49 30 346 467 850info@logisticoo.comMon–Fri 8am–6pm Berlin time (CET/CEST)

Route and delivery date

Collection
Construction site

We check every route and come back with a proposal.

Delivery date
Is there a fixed delivery time window? (optional)

What is being delivered?

Dimensions of the largest piece (L × W × H)
Total weight
Unloading at the site

We check per request what is possible at your site.

Access to the site (optional)

You can send site plans, load lists or photos of the access after our first reply.

Contact and review

Anything that matters for planning.

Your details at a glance

Please review your details. “Edit” takes you back to the step; nothing is lost.