Delivering plasterboard and drywall materials

During fit-out each floor needs boards, studs and accessories – in large quantities and usually by section. Board packs are heavy, sensitive to moisture and their edges break easily. We deliver palletised to the agreed unloading point; bringing them into the floors is done by the fit-out contractor.

What matters

Moisture
Keep boards dry – tarpaulin, no unloading into puddles.
Pack weight
Board packs are heavy; choose unloading accordingly.
Edges
Do not knock board edges when unloading.
Sections
Delivery per floor or section by call-off.

Planning questions

We clarify these points before quoting – the earlier they are known, the more precise the plan.

  1. Which boards and profiles, how many packs?
  2. How is unloading done – forklift, crane, truck-mounted forklift?
  3. Is there a covered set-down area?
  4. Called off by section?

What we need from you

  • Material list
  • Pack weights
  • Set-down area
  • Call-off rhythm

Preparation: Installation, fitting and distribution inside the building are done by your team. We deliver to the agreed, accessible unloading point – unloading scope, waiting time and returns are set out in the quote.

What we do for you

What we organise

  • Transport of building materials and elements within standard limits – from plant or merchant to site
  • Delivery in the agreed slot, with notice and a fixed contact
  • Crane truck, truck-mounted forklift or inloader can be organised via partners, by arrangement

Good to know

Bringing materials into the floors – by crane onto slab edges or by hoist – is not part of our standard scope. If wanted, we agree it in advance.

How it works

  1. 01

    Request

    You send collection point, site, date and load details using the form below – anything unknown can stay open.

  2. 02

    Review

    We check quantities, weight and unloading and plan vehicle and dates.

  3. 03

    Quote

    You receive a quote with a clear scope: transport, delivery slot, unloading and any return runs.

  4. 04

    Execution

    Delivery in the agreed slot, unloading at the agreed point, handover against delivery note.

Questions and answers: Plasterboard and drywall

Do you bring plasterboard into the building?

Not as standard. We unload at the agreed point; setting down by crane on floor levels only by explicit agreement.

How are boards protected from rain?

Under tarpaulin on the vehicle. On site a dry set-down area is needed – that should be fixed in advance.

Can boards arrive regularly as work progresses?

Yes, we agree call-offs per floor or section and plan runs accordingly.

Request

Request for this topic: Plasterboard and drywall

Three steps. Anything you do not know yet can be left open.

Details for planning

  • Material list
  • Pack weights
  • Set-down area
  • Call-off rhythm

Prefer to talk directly?

+49 30 346 467 850info@logisticoo.comMon–Fri 8am–6pm Berlin time (CET/CEST)

Route and delivery date

Collection
Construction site

We check every route and come back with a proposal.

Delivery date
Is there a fixed delivery time window? (optional)

What is being delivered?

Dimensions of the largest piece (L × W × H)
Total weight
Unloading at the site

We check per request what is possible at your site.

Access to the site (optional)

You can send site plans, load lists or photos of the access after our first reply.