Baustoff-Logistik

Materials

Delivering windows and doors to site

Finished windows have glass, hardware and sensitive frame surfaces – and each unit has its fixed place in the building. We transport windows and doors upright on racks or in the manufacturer's packaging, sorted by floor or flat on request. Distribution inside the building is done by your installation team.

What matters

Upright
Windows travel upright on racks, secured against tipping.
Frames
Protect coated and foiled frames from pressure marks.
Sorting
Loaded by position list so nothing has to be searched for on site.
Unloading
At the agreed point – not into the flats.

Planning questions

We clarify these points before quoting – the earlier they are known, the more precise the plan.

  1. How many units, which sizes?
  2. On racks or packed?
  3. Delivered by floor or section?
  4. Where is unloading?

What we need from you

  • Position list
  • Rack or packaging type
  • Delivery sections
  • Unloading point

Preparation: Installation, fitting and distribution inside the building are done by your team. We deliver to the agreed, accessible unloading point – unloading scope, waiting time and returns are set out in the quote.

What we do for you

What we organise

  • Transport of building materials and elements within standard limits – from plant or merchant to site
  • Delivery in the agreed slot, with notice and a fixed contact
  • Crane truck, truck-mounted forklift or inloader can be organised via partners, by arrangement

Good to know

Distributing windows to floors and flats is not part of transport. Plan your installation team or a site hoist for it.

How it works

  1. 01

    Request

    You send collection point, site, date and load details using the form below – anything unknown can stay open.

  2. 02

    Review

    We check units, racks and unloading point and plan vehicle and loading sequence.

  3. 03

    Quote

    You receive a quote with a clear scope: transport, delivery slot, unloading and any return runs.

  4. 04

    Execution

    Collection at the plant, secured transport, delivery in the slot, handover with visual check.

Questions and answers: Windows and doors

Do you take the windows up to the floors?

No. We unload at an agreed point; distribution inside the building is done by your installation team.

How are windows secured against tipping?

On racks with straps and interlayers, so frames and glass do not knock against each other.

Can you deliver entrance doors and windows together?

Yes, if racks and packaging are compatible. We plan loading so heavy doors do not press against glass.

Request

Request for this topic: Windows and doors

Three steps. Anything you do not know yet can be left open.

Details for planning

  • Position list
  • Rack or packaging type
  • Delivery sections
  • Unloading point

Prefer to talk directly?

+49 30 346 467 850info@logisticoo.comMon–Fri 8am–6pm Berlin time (CET/CEST)

Route and delivery date

Collection
Construction site

We check every route and come back with a proposal.

Delivery date
Is there a fixed delivery time window? (optional)

What is being delivered?

Dimensions of the largest piece (L × W × H)
Total weight
Unloading at the site

We check per request what is possible at your site.

Access to the site (optional)

You can send site plans, load lists or photos of the access after our first reply.

Contact and review

Anything that matters for planning.

Your details at a glance

Please review your details. “Edit” takes you back to the step; nothing is lost.