Reinforcement comes as bars, mesh and prefabricated cages – long, heavy and differently composed for each section. VDI 2700 sheet 11 is a guideline dedicated to securing reinforcing steel. Unloading is almost always by crane, often straight onto the storage area next to the element.

What matters

Dedicated guideline
VDI 2700 sheet 11 covers securing reinforcing steel.
Length
Bar length and mesh size determine vehicle and overhang.
Positions
Bending schedules and position numbers per section.
Crane
Unloading by site crane or crane truck.

Planning questions

We clarify these points before quoting – the earlier they are known, the more precise the plan.

  1. Bars, mesh or cages – in which lengths?
  2. How heavy is the delivery?
  3. Delivered by section?
  4. How and where is it unloaded?

What we need from you

  • Bending schedule or delivery list
  • Longest piece and weight
  • Construction section
  • Unloading

Preparation: Installation, fitting and distribution inside the building are done by your team. We deliver to the agreed, accessible unloading point – unloading scope, waiting time and returns are set out in the quote.

What we do for you

What we organise

  • Transport of building materials and elements within standard limits – from plant or merchant to site
  • Delivery in the agreed slot, with notice and a fixed contact
  • Crane truck, truck-mounted forklift or inloader can be organised via partners, by arrangement

Good to know

We organise scheduled transport of building materials and elements within the permitted vehicle, load and weight limits. If a shipment needs heavy or out-of-gauge transport because of its dimensions or loads, we plan it separately as an abnormal load.

How it works

  1. 01

    Request

    You send collection point, site, date and load details using the form below – anything unknown can stay open.

  2. 02

    Review

    We check lengths, weight and unloading and plan vehicle and date.

  3. 03

    Quote

    You receive a quote with a clear scope: transport, delivery slot, unloading and any return runs.

  4. 04

    Execution

    Collection at the bending shop, secured transport, unloading at the storage area as agreed.

Questions and answers: Rebar and reinforcement

Are there special rules for securing reinforcing steel?

Yes. Besides the general duty to secure loads, VDI 2700 sheet 11 describes securing reinforcing steel on road vehicles.

Can reinforcement cages be delivered too?

Yes, if their dimensions fit the vehicle. Bulky cages are planned individually for deck space and unloading.

How is reinforcement unloaded?

Usually by crane with suitable lifting gear. Who slings is clarified beforehand.

Request

Request for this topic: Rebar and reinforcement

Three steps. Anything you do not know yet can be left open.

Details for planning

  • Bending schedule or delivery list
  • Longest piece and weight
  • Construction section
  • Unloading

Prefer to talk directly?

+49 30 346 467 850info@logisticoo.comMon–Fri 8am–6pm Berlin time (CET/CEST)

Route and delivery date

Collection
Construction site

We check every route and come back with a proposal.

Delivery date
Is there a fixed delivery time window? (optional)

What is being delivered?

Dimensions of the largest piece (L × W × H)
Total weight
Unloading at the site

We check per request what is possible at your site.

Access to the site (optional)

You can send site plans, load lists or photos of the access after our first reply.