Materials
Delivering masonry blocks
During shell construction blocks are used pallet by pallet – clay bricks, sand-lime, aerated concrete or large-format elements. The closer the pallets are to the work area, the less they are moved again. With a crane truck they can often be set right by the wall or on the storage area next to the building; without a crane, a truck-mounted forklift helps.
What matters
- Heavy
- Block pallets reach the vehicle weight quickly.
- Place close
- The closer to the work area, the less re-handling.
- Crane or forklift
- Crane truck for distance and height, truck-mounted forklift for level areas – both via partners, by arrangement.
- Rhythm
- Delivery by masonry progress, floor by floor.
Planning questions
We clarify these points before quoting – the earlier they are known, the more precise the plan.
- Which blocks, how many pallets?
- Where should the pallets stand?
- Crane truck or truck-mounted forklift?
- How often is delivery needed?
What we need from you
- Number and weight of pallets
- Set-down point
- Unloading
- Delivery rhythm
Preparation: Installation, fitting and distribution inside the building are done by your team. We deliver to the agreed, accessible unloading point – unloading scope, waiting time and returns are set out in the quote.
What we do for you
What we organise
- Transport of building materials and elements within standard limits – from plant or merchant to site
- Delivery in the agreed slot, with notice and a fixed contact
- Crane truck, truck-mounted forklift or inloader can be organised via partners, by arrangement
Good to know
Setting down on floor slabs by crane is only possible by agreement and after checks – slab capacity and fall protection are the site's responsibility.
How it works
- 01
Request
You send collection point, site, date and load details using the form below – anything unknown can stay open.
- 02
Review
We check weight, set-down point and unloading and plan vehicle and rhythm.
- 03
Quote
You receive a quote with a clear scope: transport, delivery slot, unloading and any return runs.
- 04
Execution
Delivery by call-off, unloading at the agreed point, handover against delivery note.
Questions and answers: Masonry blocks
Can the crane truck place block pallets on the slab?
Only by explicit agreement and if the site confirms the capacity and safety of the set-down area. Otherwise we set down at ground level.
Which is better – crane truck or truck-mounted forklift?
Truck-mounted forklift for firm, level routes and ground-level set-down; crane truck when distance, obstacles or height must be overcome.
Do you deliver blocks on a fixed rhythm?
Yes, by call-off or on fixed days – matched to masonry progress.
Request
Request for this topic: Masonry blocks
Three steps. Anything you do not know yet can be left open.
Details for planning
- Number and weight of pallets
- Set-down point
- Unloading
- Delivery rhythm