City · Germany
Building materials logistics for Cologne
Cologne builds on old port and commercial land as well as in the dense city centre. For sites in Cologne we organise deliveries of precast elements, rebar, formwork, façades and fit-out material – scheduled in step with the site and, on request, with return of formwork and empties.
Cologne: economy and locations
At Deutzer Hafen, a former port site of around 37.7 hectares is being converted into an urban quarter. Around 3,000 homes are planned there, 6,000 to 6,900 jobs depending on the source, plus a school and day-care centres, with a target horizon around 2030. On a site of this size, shell, façade and fit-out run in parallel on several plots.
For logistics this means many deliveries to changing unloading points on one site, often for different trades at the same time. In the city centre, narrow streets and small sites come on top.
Key facts
| Fact | Source |
|---|---|
| Deutzer Hafen is a former port site of around 37.7 hectares being converted into an urban quarter. | moderne stadt, Presseinformation (As of 2025) |
| Around 3,000 homes are planned there. | City of Cologne, Deutz harbour information folder |
| Depending on the source, around 6,000 to 6,900 jobs plus a school and day-care centres are added; the target horizon is around 2030. | moderne stadt, Presseinformation (As of 2025) |
Typical shipments in Cologne
- Rebar, formwork and filigree slabs for shell sections by the water
- Façade panels and windows for residential buildings
- Return of formwork and scaffolding at the end of a section
Things to note on site
On conversion sites along the Rhine we ask about site roads, gates and the current unloading point per plot. For deliveries into the city centre we clarify standing space and access with site management before the vehicle is dispatched.
Questions and answers: Cologne
Can several plots on one site be supplied in one tour?
Yes, if goods and slots fit. Each stop gets its own delivery note.
Do you collect formwork from Cologne sites again?
Yes, on call-off – counted at collection and at handover to depot or next site.
Request
Request for Cologne
Three steps. Anything you do not know yet can be left open.
Details for planning
- Collection point and site with country
- Delivery date and whether a fixed slot applies
- Type of load: glass, façade, precast, timber, palletised goods
- Dimensions of the largest piece and total weight
- Unloading: available, crane truck, truck-mounted forklift or open
- Access to the site