Paving, kerbs and paving slabs are heavy, compact and palletised. They reach a truck's permitted weight long before the deck is full. Unloading is usually by truck-mounted forklift or crane right next to where they will be laid – on road and landscaping sites as well as in housing.

What matters

Weight
Heavy pallets: total weight limits the load, not space.
Unloading
Truck-mounted forklift or crane truck via partners, by arrangement – depending on ground and distance.
Set-down area
Pallets need firm, level ground close to where they are laid.
Several points
On request unloading at several points on one site – by agreement.

Planning questions

We clarify these points before quoting – the earlier they are known, the more precise the plan.

  1. How many pallets, how heavy?
  2. Where should they be set down?
  3. Is the ground paved?
  4. Truck-mounted forklift or crane?

What we need from you

  • Number and weight of pallets
  • Set-down point
  • Ground
  • Unloading

Preparation: Installation, fitting and distribution inside the building are done by your team. We deliver to the agreed, accessible unloading point – unloading scope, waiting time and returns are set out in the quote.

What we do for you

What we organise

  • Transport of building materials and elements within standard limits – from plant or merchant to site
  • Delivery in the agreed slot, with notice and a fixed contact
  • Crane truck, truck-mounted forklift or inloader can be organised via partners, by arrangement

Good to know

With heavy palletised goods the vehicle weight is the limit. Tell us the total weight so we plan the number of runs realistically.

How it works

  1. 01

    Request

    You send collection point, site, date and load details using the form below – anything unknown can stay open.

  2. 02

    Review

    We check weight, set-down point and ground and choose vehicle and unloading.

  3. 03

    Quote

    You receive a quote with a clear scope: transport, delivery slot, unloading and any return runs.

  4. 04

    Execution

    Delivery in the agreed slot, unloading at the agreed point, handover against delivery note.

Questions and answers: Paving, kerbs and concrete products

How many pallets of paving fit on a truck?

That depends on the weight per pallet and the vehicle; usually the permitted weight limits the load. With your figures we work out the runs.

Can the truck-mounted forklift place pallets in a garden?

If the route is firm and level and there are no steps or narrow points in the way. On lawn or soft ground we check in advance.

Do you deliver kerbs without pallets?

We ask about bundled or loose goods beforehand – they often need a crane for unloading.

Request

Request for this topic: Paving, kerbs and concrete products

Three steps. Anything you do not know yet can be left open.

Details for planning

  • Number and weight of pallets
  • Set-down point
  • Ground
  • Unloading

Prefer to talk directly?

+49 30 346 467 850info@logisticoo.comMon–Fri 8am–6pm Berlin time (CET/CEST)

Route and delivery date

Collection
Construction site

We check every route and come back with a proposal.

Delivery date
Is there a fixed delivery time window? (optional)

What is being delivered?

Dimensions of the largest piece (L × W × H)
Total weight
Unloading at the site

We check per request what is possible at your site.

Access to the site (optional)

You can send site plans, load lists or photos of the access after our first reply.